仓库及混凝土地坪打桩工程

描述

The Problem

When soil conditions cannot support heavy industrial floors, slab-on-grade construction alone is not sufficient. Settlement and uneven floors often appear months or years after construction.

Common Failures & Industry Observations

  • On soft or reclaimed ground,over 60% of slab-on-grade floorsexperience measurable settlement over time.
  • Floors rebuilt without piling on weak soil show ahigh recurrence of settlement within 3–5 years.
  • Differential settlement as small as10–15 mmcan affect racking alignment and machine performance.

Why Piling is Necessary

Concrete strength does not compensate for weak ground. Without transferring loads to stable soil layers, settlement will continue regardless of slab thickness.

Our Services & How We Solve It

We provide piling and piled slab solutions specifically for industrial floors:
  • Piled slab systems for full floor support
  • Hybrid piling under racking aisles or machinery zones
  • Settlement control for heavy-load floors
  • Integration with reinforced concrete slab design

This approach eliminates long-term settlement risk and maintains floor levelness.


发送您的询问至 Whatsapp

发送您的询问至 电邮

如何加入Homebagus的商家生态?

如果您是家私店,装修商承包商,室内设计,装修材料供应商,建材供应商,窗帘店,电器店,家居产品,家居维修服务,卫浴厨房用品店,地砖店,您可以加入我们Homebagus的商家生态中,让您成为我们的推荐商家!
我是相关的商家,希望申请加入Homebagus的商家生态。
加入我们