Galvanized (EG) PINTU BESI FRAME LEFT 33" X 84" X 5" (LEFT)

Penerangan

Opening Directions
LEFT Opening RIGHT Opening

Door knob on LEFT Door Knob on RIGHT
Hinges on RIGHT Hinges on LEFT

Technical Detail THI Door Frame

Installation Procedure

Mark out the area where the brickwork and the door is going to be
Use two lengths of timber to prop up door to standing position.
Use a spirit to plumb the frame. When it's plumbed, secure the timber stays with a couple of bricks.
You can now proceed to lay the bricks into the rebate at the back of the frame.
It is important to place mortar into the gap between the brick and the frame. This is to ensure that the frame when filled with cement will be extremely rigid and strong. Further, the wall will be constructed plumb with uniform thickness.
Each metal door frame is supplied with a number of wire brick ties. Use them to tie brickwork every fouth of fifth brick course.

Disclaimer

All product images shown are for illustration purposes only. Actual products may varies in term of size, type, brand, version, colour, and other relevant characteristics.


company_logo
Soon Shing Building Materials Sdn Bhd
https://www.soonshing.com.my
Lawati Pedagang

Whatsapp pertanyaan anda

Emel pertanyaan anda

Bagaimana Untuk Sertai HomeBagus?

Sertai sekarang untuk meningkatkan pertumbuhan perniagaan anda!